Here is an uncomfortable observation from two decades of walking into plants the week after the good news goes out: the press release typically precedes the operating system by about two years. This week L.B. Foster, the US steel and infrastructure group, appended "Operational Excellence" to a senior vice-president's title – steel products and operational excellence, one nameplate, one signature block. Nothing against the appointee; I wish them well. My argument is with the pattern. The title arrives in month one. The 06:30 meeting stays identical: the same eleven people, the same hand-drawn Pareto taped to the whiteboard, the same andon from second shift sitting in a log nobody opens. An appointment is a claim about a plant. The morning meeting is the plant's answer.

What the title actually buys

The suffix is not worthless; it is priced for a different buyer than the plant. It buys an investor signal – a steel group under margin pressure can point at a title and a governance slide. It buys an audit narrative, because certification assessors and customer auditors like a named owner of improvement. And it buys about ninety days of goodwill, the window in which plants say yes to everything because nobody yet knows what the new office can do for them. Or to them. After that, the goodwill amortises.

Walk the floor in that first quarter and the delta catalogues itself. What changes: a steering committee, a programme logo, pre-booked kaizen events, maybe a conference. What does not: the red bin still counted by hand at shift end, the weld-checker gauge study postponed a third time because the €8,000 sits in a corporate pot two signatures away, the customer complaint answered with last year's 8D template. The trade press this week carries machine-vision systems halving inspection times and calls for version passports on AI inspection. Fine instruments. A faster camera pointed at an unmanaged process mostly delivers blame at higher frame rates.

A press release can announce excellence. Only the morning meeting can pay for it.

An operating system, not a portfolio

Operational excellence is not a portfolio you hand to an executive. It is an operating system, with components, interfaces and failure modes. The load-bearing parts are few: daily management run off standing data, leader standard work, QRQC cadence at every critical process, stop authority the operators believe in, and – least glamorous, most decisive – a gauge-study budget the line can spend without a request form.

I built a greenfield quality organisation for a 900-plus-employee plant at SNOP. We had no OpEx department at all. We had QRQC boards at the critical processes, escalations that reached my desk the same day, and operators who had stopped a line and been thanked for it. Defect cost fell by 70%. We ran a full quarter without a single critical customer escalation. None of that was attributable to a title. All of it was attributable to a calendar.

At Witte Automotive the instrument was the Q-Wall and A3 discipline: problems walked to the wall, an owner named in writing, countermeasures closed standing up with the team that had them. Failure cost came down substantially, and not because the word sat in anyone's job description. An unclosed A3 with your name on it, discussed every morning, beats an appointment letter.

Through FOREAST, my consultancy, I spent years arriving at clients – ArcelorMittal, Meopta, AVX Kyocera among them – after the title had been hired and the programme bought. The ones that converted the investment into cadence shared one trait: somebody owned the agenda of the daily meeting. Not chaired it when convenient – owned the standing data, the start time, the follow-up log. Where that ownership was missing, the logo aged on banners while the meeting drifted back to whatever the loudest voice brought in that morning.

The month-one test

Plant manager, supplier auditor, recruiter – four questions do the work.

  • What can you stop? Authority in a plant is proven by stops, not signatures. Nothing stopped in month one means the authority is theoretical.
  • Which budget do you control? Can the line spend on gauge studies, MSA and quick kaizen – a few thousand euros inside 48 hours – without a form leaving the building?
  • Who owns the KPI wall? If staff maintain it for visitor walks, it is set dressing. If the line updates it before the meeting because the meeting depends on it, it is management.
  • When did you last close an A3 at the line? Standing up, with dates, cost and the team that owned the problem. Excellence that has never closed anything is branding.

Recruiters should read the suffix on a CV the same way. It tells you the employer bought the word; it says nothing about the candidate. Ask what time the meetings started and who chaired them while the candidate was on holiday – a system survives its owner's absence, a programme does not. Ask for one A3 closed personally, with cost. Candidates who ran the system answer in ninety seconds, with a story. Candidates who staffed the suffix answer with a framework.

Two assets, then the scoreboard

Hire the executive if you must. The appointment cycle is peaking, peers are doing it, and a good appointee genuinely helps. Then hand over the only two assets that matter: real stop authority and the plant's daily agenda. The rest of the letter is decoration.

I was the consultant; I always left. Programmes expire, licences lapse, banners fade. What stayed at every client that worked was a meeting that started on time, with the same data in the same order, whether or not anyone important was watching. The cadence is the scoreboard.

Which brings me back to the announcement. Somewhere in that steel-products division a first steering committee will convene, and someone will ask what operational excellence means for us. The answer is already being written, every morning at 06:30, by whoever runs that meeting and by what happens when an operator raises a hand. Close the gap between the press release and the morning meeting inside the first quarter, or it fills quietly with slides. Improvement programmes rarely die loudly. They die in that gap, one unremarkable morning at a time.

Key takeaways

  • Read the appointment as a press release until the appointee controls spend the line can actually use – gauge studies, MSA, small kaizen money released inside 48 hours.
  • Audit the calendar, not the org chart: fixed daily and weekly meetings, standing data, named owners, same-day escalation. Cadence is the deliverable.
  • Test stop authority with operators, not managers. Ask when they last stopped the line and what happened next; one punished stop undoes a year of posters.
  • Screening a CV with the suffix: ask for one personally closed A3 or 8D, with dates and cost, and ask what survived the candidate's holiday.